Power plants are entered on the CEC website as "expected" when
the developer makes a public announcement about the plant.
A formal application for a construction permit is expected in the near
future. The date when the developer might formally apply for a construction
permit is included on the CEC website. |
|
| Name |
Developer |
County |
Size (MW) |
| South City |
AES |
San Mateo |
550 |
United
Golden Gate |
El Paso
Merchant |
San Mateo |
570 |
| Antelope Valley |
Enron |
Kern |
1,000 |
| Long Beach District |
Enron |
Los Angeles |
500 |
| East Altamont |
Calpine |
Alameda |
1,100 |
| Kern Power |
North American |
Kern |
160 |
| Magnolia Repower |
City of Burbank |
Los Angeles |
310 |
| Roseville |
Enron |
Placer |
750 |
| Salton Sea Geothermal |
Cal ifornia
Energy Group |
Imperial |
300 |
| Redondo Beach |
AES |
Los Angeles |
700 |
| |
|
|
|
|