Bank Balance= INTEG ( Interest Added, 500) ~ ~ | Interest Added= Bank Balance*Interest Rate ~ ~ | Interest Rate= Lookup for the Interest Rate(Bank Balance) ~ ~ | Lookup for the Interest Rate( [(0,0)-(6000,0.08)],(0,0.04),(1000,0.04),(2000,0.05),(3000,0.05),(4000,0.06),(5000,0.06\ )) ~ ~ | ******************************************************** .Control ********************************************************~ Simulation Control Parameters | FINAL TIME = 80 ~ Year ~ The final time for the simulation. | INITIAL TIME = 0 ~ Year ~ The initial time for the simulation. | SAVEPER = TIME STEP ~ Year [0,?] ~ The frequency with which output is stored. | TIME STEP = 0.25 ~ Year [0,?] ~ The time step for the simulation. | \\\---/// Sketch information - do not modify anything except names V300 Do not put anything below this section - it will be ignored *View 1 $192-192-192,0,Times New Roman|12||0-0-0|0-0-0|0-0-255|-1--1--1|-1--1--1|96,96,100 10,1,Bank Balance,289,154,40,20,3,3,0,0,0,0,0,0 12,2,48,88,151,10,8,0,3,0,0,-1,0,0,0 1,3,5,1,4,0,0,22,0,0,0,-1--1--1,,1|(214,151)| 1,4,5,2,100,0,0,22,0,0,0,-1--1--1,,1|(132,151)| 11,5,48,173,151,6,8,34,3,0,0,1,0,0,0 10,6,Interest Added,173,170,48,11,40,3,0,0,-1,0,0,0 10,7,Interest Rate,247,231,41,11,8,3,0,0,0,0,0,0 10,8,Lookup for the Interest Rate,110,225,48,19,8,3,0,0,0,0,0,0 1,9,1,7,1,0,0,0,0,64,0,-1--1--1,,1|(282,186)| 1,10,8,7,1,0,0,0,0,64,0,-1--1--1,,1|(157,245)| 1,11,7,6,1,0,0,0,0,64,0,-1--1--1,,1|(188,204)| 1,12,1,6,1,0,0,0,0,64,0,-1--1--1,,1|(198,186)| ///---\\\ :GRAPH Graph_Fig_C.11 :TITLE Graph to Match Figure C.11 :SCALE :VAR Bank Balance :Y-MIN 0 :Y-MAX 16000 :LINE-WIDTH 4 :SCALE :VAR Interest Rate :Y-MIN 0 :Y-MAX 0.08 :LINE-WIDTH 1 :GRAPH Graph_Fig_C.12 :TITLE Graph to Match Figure C.12 :X-AXIS Bank Balance :X-DIV 4 :X-MIN 0 :X-MAX 8000 :DOTS :SCALE :VAR Interest Rate :Y-MIN 0 :Y-MAX 0.08 :L<%^E!@ 9:Current 15:0,0,0,0,0,0 19:100,0 27:2, 5:Bank Balance 24:0 25:0 26:0