Date

Lectures and Labs

Readings
 Assignments (ESRP 310 Fall 2007)
8-21 1. Introduction to Modeling

 Ch 1
 none
8-23 2. Software Demonstrations in Class

Apx A,B
Apx A #1; Apx B #3,4; Ch 1 #1

8-23

 1st lab, SLIC: Stella & Venim: Part I

 --
 --
8-28 3. Stocks and Flows: The Building Blocks

Ch 2
Ch 2 #1,2,3
 8-30 4. Numerical Simulation

Ch 3
Ch 2 #4,5,6,7

 8-30

 2nd lab, SLIC : Software: Part II

--
 --
 9-4 5. Vensim Demo & Intro to Mono Lake

Ch 4
(two bottles delayed to Thursday)
 9-6 6. Model of Mono Lake

 --
 Apx C #5,6,7,8 (two bottles)

 9-6

 3rd lab, SLIC: Software Part III

Apx C
 --
 9-11 7. Equilibrium Diagrams

Ch 5
Ch 4 #1,2,3 (model of Mono Lake)
 9-13 8. S Shaped Growth

Ch 6
--

 9-13

 4th lab, SLIC: College Growth

 --
--
 9-18 9. 1st EXAM (in class, closed book)

--
--
 9-20 10. Causal Loop Diagrams & Feedback

Ch 7
--

 9-20

 5th lab, SLIC: Causal Loop Diagrams

 --
--
 9-25 11. More on Feedback Loops

--
Ch 7 #9,10,11,12
 9-27 12. Homeostasis & the Bulls Eye Diagram

Ch 8,9
--

 9-27

 6th lab, SLIC: Model of an Epidemic

 --
--
10-2 13. Simulating Material Flows

Ch 10
--
 10-4 14. Model of the Salmon in the Tucannon River

Ch 14
Ch 10 #3,4,5 (insects)

 10-4

7th lab, SLIC: Salmon Exercises

 --
--
 10-9 15. Salmon Discussion

--
--
 10-11 16. Intro to Oscillations

Ch 17
--

 10-11

 8th lab: oscillations

 --
--
 10-16 17. Quiz & Sage Grouse Case

--
--
 10-18 18. 2nd EXAM (in class, closed book)

--
--

10-18 

 9th lab: cancelled

 --
 
 10-23 19. Cycles in Predator-Prey Populations

Ch 18
--
 10-25 20. Homeostasis, Gaia and Daisy World

Ch 21
Ch 18 #5,6,7

10-25 

 10th lab,SLIC: Daisy World Exercises

 --
 --
 10-30 21. Steps of Modeling & Project Guidelines

Ch 15
--
 11-1 22. Oscillations in Business Systems

--
-

 11-1

 11th: 3-5 in SLIC: Present ideas for projects

 --
Select teammate, model & improvement
 11-6 23. Class Cancelled (travel)

--
--
 11-8 24. Spatial Modeling (Dr. Ford & Chris Pell)

Appendix I
--

 11-8

 12th: 3-5 in SLIC: Present Eq. Diagrams

 --
 Equilibrium diagram of improved model
 11-13 25. Salmon Smolt Migration
(Dr. Ford and Casilda Saavedra)

Ch 13
--
 11-15  26. Quiz & The Tsembaga Study

 --
 --

 11-15

 13th: 3-5 in SLIC: Present Simulations

 --
First Simulations for discussion
 

 Thanksgiving Break

 --
 --
 11-27 27. Air Pollution, Vehicles & Feebates

--
--
 11-29 28. Feebate Model & Competition

 --
 --

 11-29

 14th week: project discussion

 --
New Simulations for discussion
 12-4  29. to be determined

--
--
 12-6  30. Student Presentations

 --
Report on Class Project 
   Third Exam during Finals Week